Table of Contents | ||
---|---|---|
|
Attendance
Committee Members
Name | Present |
---|---|
Elsie Wahlig (Sr Director LDCG, Linaro) | |
Andrew Wafaa (Arm) | |
Pak Lui (Futurewei) | |
Larry Wikelius (Marvell) | |
Jon Masters (Red Hat) | |
Takeharu Kato (Fujitsu) | |
Koichi Hirai (Fujitsu) | |
Kevin Pedretti (Sandia NL) | |
Yutaka Ishikawa (Riken) | |
Jakob Blomer (CERN) |
Not present
PresentGuests
Name | Present |
---|---|
Mark Orvek (VP Engineering, Linaro) | |
Andrea Gallo (VP Memberships, Linaro) | |
Joshua Terry (HPC Tech Lead, Linaro) | |
Baptiste Gerondeau (HPC Engineer, Linaro) | |
Graeme Gregory (LDCG Engineering Mgr, Linaro) | |
Victor Duan (Japan Country Mgr, Linaro) |
|
Jammy Zhou (China Country Mgr, Linaro) | |
Eric Van Hensbergen (Arm) | |
Brent Gorda (Arm) | |
Darren Cepulis (Arm) | |
Masakazu Ueno (Fujitsu) | |
Xavier Valls (CERN) | |
Joel Jones (Marvell) | |
Bill Gray (Red Hat) | |
Andrew Younge |
Dial in Information
Elsie Wahlig is inviting you to a scheduled Zoom meeting.
Topic: Elsie Wahlig's Personal Meeting Room
Join Zoom Meeting
https://zoom.us/j/6112761834
One tap mobile
+16465588656,,6112761834# US (New York)
+17207072699,,6112761834# US
Dial by your location
+1 646 558 8656 US (New York)
+1 720 707 2699 US
+1 877 853 5247 US Toll-free
+1 888 788 0099 US Toll-free
Meeting ID: 611 276 1834
Find your local number: https://zoom.us/u/aeGoL7KgTk
Agenda
- Previous meeting notes: 2019-07-2 HPC Meeting Agenda/Minutes
- Topics for 16 July 2019:
View file name 16 July 2019 HPC-SIG SC Meeting.pdf height 250 - Introduction to Joshua Terry
- Lustre Testing Update, Baptiste
- Valgrind, Andy Wafaa/ David Lecomber
- Roadmap & Priorities
- AOB
Minutes
- Notes here
Recording Link
Link here- Lustre Testing Update, Baptiste
- Pak: What is problem preventing Lustre server from running?
- Baptiste: Kernel needs extra patches.
- Valgrind, Andy Wafaa/ David Lecomber
- Arm will add engineer for Valgrind development (from David Lecomber's team)
Andrew Young: timeline?
Andy Wafaa says 8 weeks for Milestone 1. Start date is being finalized. David Lecomber has a person identified in his team.
Sy Hammond: Does this include the Large System extensions (LSE)? It stops immediately without LSE support.
Sandia can throw testing at it.
- Roadmap & Priorities
- Add Valgrind to Roadmap Elsie
- AOB
- Darren askas about SLES testing on Lustre
- Larry: There has been work on SLES15 in the Catalyst installation.
- Elsie to reach out to Catalyst and SUSE person working on Lustre.
- Next meeting
- Review Healthcheck
Action Items
- Add Valgrind to Roadmap Elsie
- Elsie to reach out to Catalyst and SUSE person working on Lustre. Neil Brown is the SUSE engineer working on Lustre (based in Australia). What is the ARm support for SLES on Arm for Lustre?
Recording Link