Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Note

This page is in progress and will be published in the second week of October

Highlights

Issues/Changes

  • Linaro offsite will occupy 1 week of September.

  • Some additional vacations will occur in September

Plans

...

Test the IVSHMEM M3 work with RPMSG

...

Highlights

  • Reworked the Jailhouse IVSHMEM UIO kernel patches to work with QEMU system emulation. (A first step in providing a user space device model using virtio-mmio)

  • Create the first draft of the AMP Virtio spec/plan. Good enough to start the RTOS and QEMU work

  • Reproduce the ST I2C demo work

Stretch Goals

  • Refresh the OpenAMP demo container

Presentations & Documents:

  • Further progress on RTOS to RTOS virtio by adding I2C and RNG and testing serial on real hardware

  • The M3 ivshmem mode has been tested using RPMSG

  • Meetings with the QEMU team about AMP machine and the QEMU QOM refactor

  • Tested the OE build of OpenAMP CI on ARM64 host (as well as x86_64)

  • Initial testing the OE build of OpenAMP CI on OE/YP master branch (was on kirkstone only)

Issues/Changes

  • Linaro offsite will occupy 1 week of September.

  • Some additional vacations will occur in September

  • The plan for Xen has changed. We will not rely on a Xen ivshmem but instead use Xen preshared memory and Xen events

  • As we are getting close to replacement, don’t put effort into building the kvmtool based demo

  • ST testing is no longer part of HPP but is in scope at upstream OpenAMP

Presentations & Documents:

View file
nameHPP Update 2023-09.pdf

Work completed this month

Jira Legacy
serverSystem JIRA
columnskey,summary,type,due,assignee,status,resolution
columnIdsissuekey,summary,issuetype,duedate,assignee,status,resolution
maximumIssues20
jqlQueryproject = HPP AND status = Closed AND resolved >= "2023/09/04" AND resolved <= "2023/0910/3007"
serverId59107c6f-1e52-32bc-b58f-400d54bba998

...