WindowsPerf GUI:
Introductory meeting with contractors assigned to the project.
Przemyslaw Wirkus to prepare WindowsPerf design which will incorporate GUI and other system components needed. Deadline 09/02/2023.
Planned to meet with contractor on site (Arm Cambridge to discuss in more detail our project).
Low team capacity in last three weeks:
Business trip (Przemyslaw Wirkus).
Sickness (Przemyslaw Wirkus ).
Two team members took Chinese New Year holidays (Steve Wan (Deactivated) & Pengxuan Zheng (Deactivated) )
Annual Leave (Everton Constantino ).
General
Content
Integrations